Supply · Consultancy · Engineering · Application +90 505 507 04 18 [email protected]
Turnkey Facade Contracting

Turnkey Ventilated Fiber Cement Facade Engineering, Sub-Framing & Site Installation

Above corporate project metrage thresholds across Türkiye, CFY Engineering & Architecture—founded by Architect Idris YAGMAHAN, Civil Engineer Celalettin YAGMAHAN, and Interior Architect M. Furkan YAGMAHAN—delivers single-contract turnkey ventilated fiber cement and fibre cement facade execution. By unifying SerFibro autoclaved cladding boards, SerProfil galvanized steel or extruded aluminium carrier sub-framing, EN 13162 Class A1 stone wool insulation, shop-drawing engineering, and supervised site installation under one contract, we eliminate multi-vendor coordination gaps and warranty blame between board suppliers, profile fabricators, and facade subcontractors. Share your architectural drawings and BOQ via +90 505 507 04 18 or [email protected] for a technical feasibility and unit-price evaluation.

Turnkey ventilated fiber cement facade engineered and installed by CFY Engineering & Architecture with SerFibro panels
Representative surface & application visual — final shade, relief depth, and batch texture are verified via physical sample prior to order.

Product Quick Specification Summary

Contracting Model Single-contract turnkey: SerFibro boards + SerProfil sub-frame + stone wool + engineering + site installation
Engineering Leadership CFY Engineering & Architecture multidisciplinary Architect + Civil Engineer + Interior Architect team
Substructure & Insulation SerProfil galvanized M/J/U/C/Omega or aluminium T/L profiles + EN 13162 Class A1 stone wool + breather membrane
Geographic Scope Nationwide across Türkiye above corporate project m² thresholds · BOQ progress billing

01 3D Laser Survey, Shop-Drawings & Elevation Module Optimization

Reinforced concrete and structural steel building frames rarely match theoretical CAD dimensions on site. Before cutting a single fiber cement sheet, CFY Engineering & Architecture conducts total-station / 3D laser facade surveys to map slab-edge deviations, window rough openings, and plumb tolerances into fabrication-ready shop-drawings.

  • Nesting optimization on 1250 × 2500 / 2800 / 3000 mm master sheets to minimize offcut waste before production.
  • Alignment of open vertical and horizontal joints (typically 8–12 mm) with window mullions, floor bands, and expansion joints.
  • Detailed 1:5 section drawings for plinth air intakes, window reveals, external corners, and ventilated parapet copings.

02 Wind-Load Engineering & SerProfil Galvanized / Aluminium Sub-Framing

Every ventilated fibre cement envelope acts as a structural rainscreen subjected to positive pressure and high corner wind suction. Our civil engineers calculate anchor pull-out loads, bracket spacing, and profile deflection limits according to building height, terrain category, and substrate type (RC shear wall, slab edge, aerated concrete, hollow brick, or structural steel).

  • Direct group supply of SerProfil roll-formed galvanized steel facade profiles (M, J, U, C, Omega sections) with structural wall thicknesses.
  • Heavy-duty extruded aluminium T- and L-profile vertical carrier systems with fixed-point (dead load) and slotted sliding-point (thermal expansion) brackets.
  • Thermal-break polyamide/EPDM isolator pads placed beneath wall brackets to suppress structural thermal bridging.

03 EN 13162 Class A1 Stone Wool, Breather Membrane & Continuous Air Cavity

Long-term hygrothermal durability and fire safety in a ventilated facade depend on what happens behind the board. Our site teams install non-combustible Class A1 facade stone wool boards, UV-stabilized vapor-permeable windproof membranes, and unobstructed rear ventilation channels that expel interstitial moisture year-round.

  • Mechanical insulation pinning (minimum 5–6 facade dowels per m²) with staggered board joints and optional black glass-fleece facing behind open joints.
  • Taped overlaps on vapor-permeable breather membranes around all bracket penetrations and window perimeters.
  • Perforated aluminium insect/rodent ventilation grilles at plinth base intakes and top parapet exhaust outlets (minimum 20–40 mm net air gap).

04 Precision PCD Sizing & Stress-Free Architectural Panel Fixing

Premature cracking on fiber cement facades is almost always caused by rigid over-tightened screws or missing expansion clearances. CFY site crews enforce strict fixed-point / sliding-point drilling geometry, sleeve-centering tools, and UV-resistant EPDM vertical joint gaskets across every SerFibro architectural series.

  • Through-coloured ColorBoard (SF-CB-SMOOTH / SF-CB-STONE) installed with colour-matched facade rivets or concealed mechanical undercut anchors where specified.
  • Grooved SF-LINEAR panels, curved SF-FLEX zones, and 20 mm SF-JAMB / SF-CORNICE window and floor trims integrated seamlessly without wet-mortar patchwork.
  • Post-cut edge sealing / hydrophobic impregnation and immediate alkaline saw-dust removal executed under documented QC checklists.

05 Eligible Building Typologies & Corporate Metrage Thresholds

Mobilizing certified scaffolding/mast-climber crews, site engineers, 3D survey instruments, and full-truck material logistics requires commercial project scale. We evaluate turnkey contracting across all 81 provinces of Türkiye for mid-to-large institutional, residential, hospitality, and industrial developments.

  • Multi-block residential estates, urban transformation towers, luxury villa compounds, and mixed-use commercial centers.
  • Hospitals, private clinics, university campuses, K-12 school buildings, hotels, and public-tender administrative facilities requiring Class A1/A2-s1,d0 fire safety.
  • Industrial headquarters, OSB factory administration buildings, R&D centers, and logistics hubs (smaller single-building jobs are supported via our complete Material + SerProfil Package supply).

06 Transparent BOQ Unit-Price Progress Billing & Single-Point Accountability

General contractors and institutional investors require predictable cash-flow and auditable site documentation. Every CFY turnkey proposal separates material, sub-framing, thermal insulation, scaffolding/access assumptions, and installation labor clearly per m² and linear meter—backed by OHS-compliant site supervision and as-built handover files.

  • Measured progress billing (monthly hakedis) tied to approved elevation completion milestones: bracket/sub-frame erection, insulation/membrane, and final panel cladding.
  • Certified work-at-height technicians, PPE enforcement, anchor pull-out test logs, and material lot traceability certificates.
  • Single corporate counterparty covering structural sub-frame integrity, weatherproofing details, and SerFibro panel performance.
Turnkey Ventilated Facade Execution — Technical & Commercial Scope Matrix
Execution Work Package Engineering & Material Standard Included Site & Contract Deliverable
1. 3D Survey & Shop-Drawings Total-station facade scan, elevation grid modulation, master-sheet nesting & 1:5 node details Signed-off DWG/PDF shop-drawings & cutting schedules before fabrication
2. Carrier Sub-Framing SerProfil galvanized steel (M/J/U/C/Omega) or extruded aluminium T/L profiles + wall brackets & thermal pads Project-specific wind-load statics, anchor pull-out verification & plumb alignment
3. Thermal & Moisture Layer EN 13162 Class A1 non-combustible facade stone wool + UV breather membrane + perforated cavity vents Continuous thermal envelope + unobstructed 20–40 mm rear air circulation channel
4. Cladding & Trim Installation PCD-sized SerFibro ColorBoard, SF-LINEAR, SF-SMOOTH-EXT, SF-FLEX & 20 mm SF-JAMB / SF-CORNICE trims Fixed/sliding stress-free mechanical fixing, EPDM joint gaskets & edge sealing
5. Site Access, QA/QC & Handover Clarified scaffolding/mast-climber matrix, OHS-certified crews, progress measurement & as-built dossier Auditable monthly progress billing (hakedis) & single-point CFY warranty handover

Structured B2B Quotation & Sample Request (Direct WhatsApp)

Compile single or multiple fibre cement product lines, thicknesses, formats, and destination details into a structured technical summary sent directly to our export desk on WhatsApp (+90 505 507 04 18). Zero server form queues.

Include Complementary Facade System Bundle (Optional — Supplied Alongside Boards) Component Specs & m² BOM Estimator →

Product Specification Lines

For multi-sheet CAD/PDF packages, you may also email: [email protected]

Related Fibre Cement Product Families

Frequently Asked Technical & Commercial Questions

What is the minimum project area (m²) required for turnkey facade contracting?

Turnkey mobilisation (3D survey, engineering supervision, site crews, and dedicated truck logistics) is generally evaluated for corporate, residential-estate, public, hospitality, and industrial facades starting from approximately 1,000–1,500 m² depending on city location, building height, and architectural complexity. For smaller villas or partial renovations, we supply the complete coordinated system package (SerFibro panels + cut-to-size + SerProfil sub-framing + fixing accessories) along with technical detailing support.

In which regions and cities of Türkiye does CFY Engineering & Architecture execute turnkey facades?

Headquartered in Istanbul, CFY Engineering & Architecture executes qualified turnkey ventilated fiber cement facade contracts nationwide across all 7 regions and 81 provinces of Türkiye—including Istanbul, Kocaeli, Bursa, Ankara, Izmir, Antalya, Mugla, Gaziantep, Kayseri, Konya, Mersin, Samsun, and Trabzon—as well as Türkiye-based facilities of international EPC contractors.

Can we request an alternative quotation comparing Turnkey Installation vs Complete System Material Supply?

Yes. General contractors who already have on-site facade crews often ask us to quote Option A (Complete Material Package: PCD-cut SerFibro panels + SerProfil M/J/U/C/Omega sub-framing + stone wool + shop-drawing support) alongside Option B (Full Turnkey Supply & Site Installation). Presenting both options side by side helps procurement teams make an informed cost and schedule decision.

How are scaffolding, site power/crane logistics, and monthly progress payments structured?

To prevent hidden surcharges, our contract scope matrix explicitly defines whether facade scaffolding or mast-climbing work platforms are provided by the Main Contractor (already erected for rough-in works) or included as an itemized line in CFY’s scope. Progress billing operates on verified monthly BOQ measurements (hakedis) aligned with material delivery to site, sub-frame installation, and completed panel m².

Does the turnkey facade assembly comply with Turkish Fire Regulation (BYKHY) and EN 13501-1 standards?

Yes. For high-rise buildings, hospitals, schools, hotels, and public facilities, we assemble non-combustible EN 12467 autoclaved SerFibro panels (A1 / A2-s1,d0 according to selected uncoated or coated finish), galvanized steel or aluminium SerProfil sub-framing, EN 13162 Class A1 stone wool insulation, and floor-level steel cavity fire barriers—delivering full technical data sheets and declaration documents for municipal occupancy sign-off.

Ready to Verify Formats, Finishes & Export Delivery Terms?

Share your target board thickness, outer dimensions, finish state, and destination port. Our commercial office prepares a product-matched quotation and sample dispatch plan.

Request via WhatsApp Request Export Quote +90 505 507 04 18
WhatsApp Export & Supply Desk